![US 31 Carmel construction zone reopens today roadconstruction](https://www.youarecurrent.com/wp-content/uploads/2014/06/roadconstruction.jpg)
US 31 Carmel construction zone reopens today
Operations are now underway to open US 31 between Old Meridian and 136th streets. The…
Operations are now underway to open US 31 between Old Meridian and 136th streets. The…
Beginning at 9 p.m. tonight, crews plan to unload bridge beams at U.S. 31/Ind. 32.…
After dealing with detours for months, motorists throughout Carmel have been repeating the same question:…
City officials are advising drivers that effective on or after Oct. 27, 146th Street between Ditch Road and…
During construction yesterday, an excavation company hit a water main on the southwest corner of…
On or after Oct. 27, 146th Street between Ditch and Springmill Roads will be closed. The…
Gray Road south of 146th Street and north of Woodfield Blvd. is closed to through…
[email protected] An 8-inch water main that broke on Oct. 3 on Gray Road between 96th and 106th Streets…
[email protected] A Citizens Water main break has caused a temporary road closure of Gray Road…
[email protected] Due to a gas link break in the area of 146th Street and Oakridge Road,…